is this possible?
Basically I'm trying to end up with 1 x vDs with 2 x 10GB uplinks.. then I'll divvy up the VSAN, MGMT, vMotion and VM network using NIOC shares..
So the UCS host only has 2 x uplinks present, I had to bootstrap the VSAN environment (greenfield site), so have ended up with 2 x vswitches
1 x vswitch has vmkernel for mgmt and a VM network which the vcsa and psc currently use
1 x vswitch has vmkernel for vsan
both vswitches only have 1 x nic each..
I'm trying to figure out how VSAN will react if I try to migrate its network temporarily to the 1st vswicth that also has the mgmt vmkernel and vcsa/psc vm network..
and then do the usual add 1 nic to the vDs and stagger things across accordingly.. anyone else done such a crazy thing?